Emami Bangladesh Limited
Gazipur

Project Key Specifications

Official engineering contract parameters & execution scope

Certified Completion
Project Title

Emami Bangladesh Limited

Engineering Category

Cosmetics and ayurvedic medicine manufacturing, importing, and selling company

Facility Location

Gazipur

Execution Scope & Engineering Deliverables
Design Drawing of Fire Safety Plan/ NOC consists of the following design: a) Master Plan Drawing of Fire Protection Layout including all Building Structural Details. b) All Building Fire Protection Systems Drawing. c) All Building Fire Detection Systems Drawing. Refuge Area Drawing. d) Lightning Protection Systems (LPS) . e) Pump Room & Reservoir Details . f) Schematic Diagram of Fire Hydrant /Protection Systems. g) Gas Suppression Systems Design of Utility Building . h) SLD (Single Line Diagram) of Substation . i) Fire Separation Drawing . j) Evacuation Plan Drawing. k) Mechanical Ventilation Drawing of Basemen l ) Booklet Development: a. information with current front View of Building, b. Substation, Transformer, LT/HT Panel, PFI panel, Generator, Broiler Technical Datasheet with Picture, c. Total Fire Systems Equipment Qty. & Technical Specification d. Maintenance Team full Information. e. Guideline For Fire Safety Issue.

Project Overview & Execution Scope

Comprehensive engineering consultancy and deployment details

Design Drawing of Fire Safety Plan/ NOC consists of the following design: a) Master Plan Drawing of Fire Protection Layout including all Building Structural Details. b) All Building Fire Protection Systems Drawing. c) All Building Fire Detection Systems Drawing. Refuge Area Drawing. d) Lightning Protection Systems (LPS) . e) Pump Room & Reservoir Details . f) Schematic Diagram of Fire Hydrant /Protection Systems. g) Gas Suppression Systems Design of Utility Building . h) SLD (Single Line Diagram) of Substation . i) Fire Separation Drawing . j) Evacuation Plan Drawing. k) Mechanical Ventilation Drawing of Basemen l ) Booklet Development: a. information with current front View of Building, b. Substation, Transformer, LT/HT Panel, PFI panel, Generator, Broiler Technical Datasheet with Picture, c. Total Fire Systems Equipment Qty. & Technical Specification d. Maintenance Team full Information. e. Guideline For Fire Safety Issue.
Share Project Case Study:

Featured Showcase

Need Similar EPC Solutions?

Consult with our chartered engineers for BNBC-compliant fire protection, electrical audits, or smart BMS setups.