Project Title
Fuji Knit Wires Limited
Engineering Category
Manufacturer and exporter of knit garments
Facility Location
Hossain Ahmed Road, Fatulla,Narayanganj.
Design Drawing of Fire Safety Plan/ NOC consists of the following design: a) Master Plan Drawing of Fire Protection Layout including of all Building Structural Details. b) All Building Fire Protection Systems Drawing. c) All Building Fire Detection Systems Drawing. Refuge Area Drawing . d) Lightining Protection Systems (LPS) . e) Pump Room & Reservoir Details. f) Schematic Diagram of Fire Hydrant /Protection Systems. g) Gas Suppression Systems Design of Utility Building. h) SLD (Single Line Diagram) of Substation. i) Fire Separation Drawing. j) Evacuation Plan Drawing. k) Mechanical Ventilation Drawing of Basemen l ) Booklet Development : a. information with current front View of Building, b. Substation, Transformer, LT/HT Panel ,PFI panel, Generator, Broiler Technical Datasheet with Picture, c. Total Fire Systems Equipment Qty. & Technical Specification d. Maintenance Team full Information. e. Guideline For Fire Safety Issue.
Project Overview & Execution Scope
Comprehensive engineering consultancy and deployment details
Design Drawing of Fire Safety Plan/ NOC consists of the following design: a) Master Plan Drawing of Fire Protection Layout including of all Building Structural Details. b) All Building Fire Protection Systems Drawing. c) All Building Fire Detection Systems Drawing. Refuge Area Drawing . d) Lightining Protection Systems (LPS) . e) Pump Room & Reservoir Details. f) Schematic Diagram of Fire Hydrant /Protection Systems. g) Gas Suppression Systems Design of Utility Building. h) SLD (Single Line Diagram) of Substation. i) Fire Separation Drawing. j) Evacuation Plan Drawing. k) Mechanical Ventilation Drawing of Basemen l ) Booklet Development : a. information with current front View of Building, b. Substation, Transformer, LT/HT Panel ,PFI panel, Generator, Broiler Technical Datasheet with Picture, c. Total Fire Systems Equipment Qty. & Technical Specification d. Maintenance Team full Information. e. Guideline For Fire Safety Issue.
Share Project Case Study:
Related Projects
Fire Sprinkler System, Smoke Alarm, and Fire Detection System
Nagorik Architecture & Construction
Bangladesh
Automation,BMS
Charubritto
Fultola,Jashar Sadar ,9210
Fire Detection System
Spectra Hexa Feeds Ltd
Ichail, Utholi, Shibalaya, Manikgonj
Networking,CCTV & Smart Meeting Room Solution, Online UPS & Access Control Systems