WTP, Cumilla EPZ, Old Airport Area , Cumilla.
Project Key Specifications
Official engineering contract parameters & execution scope
Project Title
Sigma Eco-Tech Limited (CETP).
Engineering Category
Water treatment plant (WTP)
Facility Location
WTP, Cumilla EPZ, Old Airport Area , Cumilla.
Design Drawing of Fire Safety Plan/ NOC consist with below design : a) Master Plan Drawing of Fire Protection Layout including of all Building Structural Details. b) All Building Fire Protection Systems Drawing. c) All Building Fire Detection Systems Drawing. Refuge Area Drawing . d) Lightining Protection Systems (LPS) . e) Pump Room & Reservoir Details . f) Schematic Diagram of Fire Hydrant /Protection Systems. g) Gas Suppression Systems Design of Utility Building . h) SLD (Single Line Diagram) of Substation . i) Fire Separation Drawing . j) Evacuation Plan Drawing. k) Mechanical Ventilation Drawing of Basemen l ) Booklet Development : a. information with current front View of Building, b. Substation, Transformer, LT/HT Panel ,PFI panel, Generator, Broiler Technical Datasheet with Picture, c. Total Fire Systems Equipment Qty. & Technical Specification d. Maintenance Team full Information . e. Guideline For Fire Safety Issue.
Project Overview & Execution Scope
Comprehensive engineering consultancy and deployment details
Design Drawing of Fire Safety Plan/ NOC consist with below design : a) Master Plan Drawing of Fire Protection Layout including of all Building Structural Details. b) All Building Fire Protection Systems Drawing. c) All Building Fire Detection Systems Drawing. Refuge Area Drawing . d) Lightining Protection Systems (LPS) . e) Pump Room & Reservoir Details . f) Schematic Diagram of Fire Hydrant /Protection Systems. g) Gas Suppression Systems Design of Utility Building . h) SLD (Single Line Diagram) of Substation . i) Fire Separation Drawing . j) Evacuation Plan Drawing. k) Mechanical Ventilation Drawing of Basemen l ) Booklet Development : a. information with current front View of Building, b. Substation, Transformer, LT/HT Panel ,PFI panel, Generator, Broiler Technical Datasheet with Picture, c. Total Fire Systems Equipment Qty. & Technical Specification d. Maintenance Team full Information . e. Guideline For Fire Safety Issue.
Share Project Case Study:
Related Projects
Featured Showcase
Need Similar EPC Solutions?
Consult with our chartered engineers for BNBC-compliant fire protection, electrical audits, or smart BMS setups.